Solutions

Fourteen solutions for a warehouse that can do better

Everything DVD Intelligence offers, as concrete solutions: from process analysis and forecasting to a tidy workplace, boards, dashboards and AI. Each solution starts from a problem a warehouse manager recognises, and explains what it is and what it delivers.

See

Know where you lose time and money, in figures. It always starts on the floor.

?

Walking the floor

"On paper everything runs fine, but on the floor it's different."

Walking a full shift with the people who do the work, nights included: seeing where people wait, search or do work twice, and asking why. This is always the first step, and the basis for the analyses below. The result: a list of what annoys the team, in their own words, with how often each point occurs.

Quick scanDetail: Improvement programme
Read the full explanation →
BeforeAfterDispatch zoneLoading docksSample warehouseStart620 m per orderDispatch zoneLoading docksSample warehouseStart160 m per order

Walking route: how far do your people walk?

"My people walk all day, but I don't know where the time goes."

A floor plan of the warehouse showing the route an order picker actually walks for one order. The more the lines go back and forth, the more unnecessary walking there is. After the improvement, the new route is drawn. The result: the walking distance per order, before and after, in metres.

ProcessDetail: Improvement programme
Read the full explanation →
2 days98 % of the time the order is standing still

Order flow: where does your order build up delay?

"An order is picked quickly, yet it takes days before it leaves."

A map that follows an order from arrival to departure, showing at each step how long is spent working and waiting. The processes that affect it are on it too, such as the release, replenishment and transport planning. That shows where the delay builds up and which other process causes it. The result: the total lead time, the delay that builds up per step, and the links that cost the most time.

ProcessDetail: Improvement programme
Read the full explanation →
One order line, in secondsWalkScanGrabSearchstandard

Time measurement: how long should a handling step take?

"I don't know how many people I really need per hour."

A task is broken down into small handling steps, such as walking, scanning, grabbing and placing, and measured per step. With fixed standard times it is clear how long an order line should take, and which part is waste, such as searching. The result: a fair standard per order line and a staffing level that matches the work.

Process
Read the full explanation →
Order lines per labour hourstandard 110wk 1wk 5

Productivity and KPIs

"We work hard, but I can't say whether we are productive."

A small set of key figures that really say something: order lines per labour hour, cost per order, trips that leave on time and errors per 1,000 lines. Each figure gets a standard based on time measurement, so it is clear what "good" is, per shift and per zone. The result: know how productive the warehouse is, where the difference lies, and whether an improvement really delivers.

Measured per shift, zone or team, not per person. Measuring per employee requires agreements with the team and is subject to strict rules.

Process & data
Read the full explanation →
today

Forecast and staffing

"At peak times we are always late, and in quiet times people stand waiting."

A forecast of the volume per day and per hour, based on history, linked to how many people are needed per zone. The result: a plan that is right in advance, instead of adjusting afterwards.

Data & AI
Read the full explanation →
E17 Customer C · stop 3 45 min waiting Depot · route 12

Trip and transport analysis

"Some trips take much longer than planned, and I don't know why."

An analysis that puts driving time, waiting time and unloading and loading time side by side per route and per customer, so it becomes visible where the delay arises. The result: an overview in Excel or Power BI of the routes and customers that cost the most time, and what can be done about it.

Data
Read the full explanation →
Solve

Remove the cause, together with the team.

Dispatch

Layout and slotting

"The fastest-moving items are stored at the back."

A map of the warehouse that shows how often each location is picked, and a new layout with the fast movers close to dispatch. The result: shorter walking routes. In practice this delivered +30 % productivity.

Process & data
Read the full explanation →
Dock 1Dock 2Dock 3

Dock and loading planning

"Trucks are waiting, and we pay waiting charges."

An overview of when trucks arrive and how long loading takes, turned into fixed time slots and a loading plan per dock. The result: fewer waiting drivers and a calmer dock. In practice, the waiting-time penalties virtually disappeared.

Process
Read the full explanation →
Workplace organisation board · week 14 · score per zoneSortSet in orderShineStandardiseSustainSafetyReceiving92 %88 %86 %74 %not yet90 %Storage90 %84 %78 %66 %not yet88 %Order picking88 %71 %82 %not yetnot yet85 %Packing95 %90 %87 %81 %not yet93 %Dispatch86 %68 %64 %not yetnot yet79 %85 % or more70 to 84 %below 70 %A step is complete when it scores 85 % in two audits in a row in all zones.Problem of the month: empty pallets block the walkways in Dispatch.Approach: a fixed zone for empty pallets · floor marking in week 15 · check with an audit in week 16 · then the same agreement in all zones

A tidy, safe workplace

"We keep searching for materials, and the floor is cluttered."

A method to tidy up the workplace together with the team, give everything a fixed place and keep those agreements with a short audit. Safety in the workplace is part of it too. The result: less searching, fewer accidents, and a workplace a customer can walk through.

Process
Read the full explanation →

Training system

"I'm not sure who is allowed to do which task alone."

Work instructions with steps and photos, a training matrix that shows who can do what, and an app the trainer uses to record on the floor. The result: new people who work alone sooner, and proof per person for an audit.

Process, data & AIDetail: own page
Read the full explanation →
Sustain

Making sure the improvement still works after three months.

Hourly board · early shift6-7u 420/4307-8 am 420/365 replenishment late8-9u 420/4109-10u 420/425

Visual boards and daily huddle

"I only hear about problems the next day."

A board per shift that shows every hour what was planned and what was achieved, with a short ten-minute daily huddle at the board. The result: problems that are solved during the shift, by the team itself.

Process
Read the full explanation →
412143

Dashboards

"Every morning someone merges Excel lists."

One dashboard with the figures from WMS, ERP and planning, ready every morning at 7 am. The result: one figure for everyone, without merging Excel lists.

DataDetail: Data & dashboards, with live demos
Read the full explanation →
Which trips are at risk of being late?14 orders at risk,8 waiting for replenishment

AI assistant

"I want to know before the customer calls."

An assistant on the company's own figures that warns in time and answers questions in plain language. The calculation is always done on the data first; the AI only explains. The result: the warning at 7 am, not when the customer calls.

AIDetail: AI assistant, with live demo
Read the full explanation →
Which solution fits your warehouse? Start with a 3-day quick scan.
See the quick scan
ContactBook an introduction